Paintjob 2005

In February 2005 the hull has been repainted with ‘Double Coat’. and the black pvc railcapping around the hull has been replaced as well. Furthermore the scepters have been replaced and new instruments installed (B&G H1000).

paint_job paint_job2 switch_panel

A new switch panel has been custom made and installed with Carlingswitch automatic circuit breakers.